Barbara Bush Elementary


owner:
Mesa Unified School District
general contractor:
Cohen Construction
size:
71,519 sf
location:
4925 E Ingram St Mesa, AZ
completion:
August 1996
delivery method:
Design, Bid, Build
market sector:
K-12 Education
description:
Named after and dedicated by our country's former First Lady, this school features natural day lighting in all of the major spaces, which reduces the demand for power for the lighting loads. Other energy saving systems included a chilled water system with a thermal water storage system, and an energy management system. In addition, communications/data systems are enhanced by a fully integrated data/video/intercom system.